Glenarbon Solar Farm

PROJECT STATUS
Prospective
Glenarbon Solar Farm

The Glenarbon Solar Farm is a proposed renewable energy facility located 65 kilometres east of Goondiwindi, Queensland. The scope of the project includes a 800 MW solar farm and 800 MW / 3200 MWH BESS. 

The project is being developed by Edify Energy.

Procurement

Procuring Agency: Edify Energy

PROJECT HISTORY

Nov 2026 The project was referred to the EPBC Portal for federal environmental assessment.
Sector
Energy
Procurement approach
Engineering, Procurement and Construction (EPC) |
Location
Queensland |